Acrylic glass 7.5x0.7m in a stainless steel pool
We completed the production, delivery, and installation of a 7.5-meter acrylic glass panel in a modern stainless steel swimming pool. Świeradów-Zdrój, scheduled for completion in 2024.
The biggest challenge was the installation inside the large hall, which was already completely finished after the modernization of the old facility - the installed windows and doors prevented the use of standard lifting equipment.
The transportation and loading of the large-scale glass pane was accomplished using specialized trolleys, lifts, and teamwork. The entire process was carried out with the utmost precision and safety.
Scope of implementation:
production of acrylic glass to size (7.5 m)
transport to the facility
installation in the swimming pool hall
professional installation and sealing