top of page

Acrylic pool glass 5x1m

Private swimming pool with acrylic glass – Jelenia Góra. Completion date 2022.

We completed a demanding glass installation in the pool area, where technical constraints and the building's structure posed key challenges. A structural element located above the pool prevented the glass from being lifted over a winch using standard methods, requiring precise maneuvers and precision work, literally down to the millimeters.

Thanks to close cooperation with the team of crane operators and careful planning of the entire process, the glass was safely and precisely placed in place.

The scope of implementation included:

✔️ Custom-made glass production

✔️ Transport and delivery logistics

✔️ Specialized assembly using a crane

✔️ Professional sealing and finishing

Okno basenowe akrylowe
IMG_20220905_132528.jpg
szuba akrylowa Jelenia Gora.jpg
OB Jelenia Góra.jpg

© 2021-2025  H2O Projects. All rights reserved.

bottom of page